"A-gong-dian river water quality improvement and pollution reduction of concrete plans" and the "Kaohsiung County, the people involved in water environment patrol integration plans" and the "Kaohsiung County, the river rubbish clear plan"

Absrtact
Kaohsiung County Government Environmental Protection Agency pointed out that along the river by the strong Agongdian against illegal operators, Agongdian River, "Red River" River, from the mouth of all rivers in Okayama Qiaozhi diminish redness and gradually reduced to only a part of the river at this stage in the from time to time by the factory waste-water treatment of waste water flushed, the county Environmental Protection Bureau and the technical team of good works as the Republic of 98 years to May 31 only to complete the inspection Agongdian Creek 1116 times factories along the river, and seized 13 suspected waste water underground pipe seized waste-water treatment institutions 2 times. The Agongdian River watershed as a focal point of 92 years initially selected river regulation, therefore, Kaohsiung County Government Environmental Protection Agency (hereinafter referred to as EPA) special drawing up a "Agongdian River Basin in river water quality improvement and pollution abatement concrete action plan" (hereinafter referred to as of this project), to promote water conservation. First, the cause of audit work The team at the project implementation period for the Agongdian main stream within the column tube of 360 public institutions to conduct a classification system of the inspection work and planning to be completed during the execution of a total of 382 effluent samples test tube and institutions, of which 32 times unable to meet the water standards, with a pass rate of 91.6%, the cumulative sanctions amounting to 4.388 million yuan. In the case of non-compliance inspection items include "not to take with emissions permits", "not on the person in charge within the time limit handle change" and "flow around a waste-water treatment" and other three most common. 2, factory waste-water treatment and underground pipe inventory operations Plan period, the team was discovered by his grandfather's shop in River Basin in waste-water treatment plant there are two, and seized 13 underground pipe, the underground pipe compile relevant information have been sent to the EPA for future reference and the sealing operation has been completed. In addition, this year's addition to the underground pipe has been sealed, still from time to time to a sealed tube Department to conduct inspections of operations to prevent unscrupulous operators, Management Office will be closed to carry out demolition work. So that it can effectively deter the illegal business owners underground pipe waste-water treatment operations. 3, wastewater treatment facilities and reasonable analysis and functional evaluation For the five evaluation report on the cause of missing the function to check for missing to improve the review, Yu-jin Feng Hsin Enterprise Co., Ltd., on-site storage area has been set up to complete barrier facilities, volume of oil storage capacity of 238%, in line with regulatory requirements, and a new set of wastewater treatment facilities have been completed civil engineering structures, has been approved by the EPA for water measures plan. Okayama district in Kaohsiung County, meat market, slaughterhouse, the ground water of Kaohsiung County Government has the right to use the application and on-site inspection has been improved sedimentation tank overflow partitions and to strengthen the dross removal operations. In the Aerospace Industrial Development Co., Ltd., including water pollution control measure plan change has become a case handled by the opening of tenders, phosphoric acid tank is disabled, X-ray waste water improvement projects in water pollution control measures were added after the plan sent the factory area pipeline inventory confirmed to be marked, wastewater plant drains pipelines have been put up signs. In the light Yang Industrial Co., Ltd., including the pipeline has been unnecessarily removed, and the marking fluid pipelines name, the site has quickly mixed with the air flow trough the valve off small, to avoid an excessive amount of air, leading to rapid mixing tank agitation is too large, caused by spills of the situation, Han manufacturing process has been changed from the waste water from other drains or pipelines to collect wastewater treatment plant discharge to the overflow weir on the moss has been sent to clear the completed and other projects. Plants finally luzhu shin Co., Ltd. to improve the outcome for some of the machinery products did not fill in the license file will be made to change licensing transaction, on-site waste water ditch at the top of stamped steel plate to prevent leakage, the pipeline has been unnecessarily removed, and the marked Fluid name and damaged pipelines in the old storage barrels have been removed completed. Fourth, to promote public participation and the water environment counties patrol integration (A) The patrol team the current situation and patrol the scope of the organization Kaohsiung County, were set up in various rivers and river patrol team a total of 11 teams (Erzen 5 teams, Code kitebrook two teams, two teams Agongdian Creek, Fengshan River 1 Team 1 Team and Kao-Ping River), the current patrol team the number of players expected to be approximately 251 people. (B) patrol team with the content of quantitative data statistics Up to now (98 May), the patrol team plans to integrate the implementation of results of completed projects include the patrol team net Creek Kiyokawa activity 22 screenings to help patrol team reported underground pipe 17, dirty-point 122, to mention the public expositions Reward bonus 10 pollution cases of prosecution to hold sewage reduction of events to 11 screenings, press releases 25 to arrange for media coverage of special deeds of the outcome of a screening of the patrol team handle the patrol team on the outcome of education and training-cum - will be a screening and processing of Kaohsiung County patrol team to observe the activities of a screening visit. 5, Agongdian Creek Water Quality Improvement The cause of the basin through the tube inspection, factory waste-water treatment and underground pipe inventory, wastewater treatment facilities, rational analysis evaluation and river patrol team is working well Agongdian Creek water quality has improved from the old station indicators of water quality in Hong Kong Bridge Monitoring data showed that, RPI-year average of 8.0 years, down from 96 to 97 years, 6.25, RPI to improve the rate of 22%, 97 of which part of the second half of the month from the RPI value is improved to moderately polluted seriously polluted, said the Old Bridge in Hong Kong improving the water quality has a certain effect.
Keyword
A-gong-dian river basin, inspection, water sampling, standards of industrial wastewater discharges, illegal discharging pipes, wastewater treatment facility inspection
Open
top